SIA OpenIR  > 工业信息学研究室  > 工业控制系统研究室
A heuristic approach for rework-based product design project scheduling problem
Lu R(卢睿); Li LY(李林瑛)
作者部门工业控制系统研究室
会议名称20th Chinese Control and Decision Conference
会议日期July 2-4, 2008
会议地点Yantai, Shandong, China
会议录名称2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11
出版者IEEE
出版地NEW YORK
2008
页码1486-1491
收录类别EI ; CPCI(ISTP)
EI收录号20084011609968
WOS记录号WOS:000260562701008
产权排序2
ISBN号978-1-4244-1733-9
关键词Stochastic Rcpsp Overlap Iteration Product Design Project Simulation
摘要Product design project scheduling is a complex problem which involves a large number of tasks and information exchanges in a stochastic, resource-constrained project network where iteration and overlap between tasks often take place. The classical determined RCPSP which has been widely studied is based on assumption of fixed duration of tasks and zero-lag finish-start precedence relationships in acyclic AON network. Very little efforts have been made in project scheduling with stochastic duration, especially in cyclic network with rework possibility. This paper presents an approach for rework-based product design project scheduling problem, taking overlap and iteration which are inherent nature in PDP into account. We consider this problem under the assumption that task duration can be modeled by a triangle distribution and can be sampled by simulation techniques. Three priority rules which are widely used in solving deterministic RCPSP are modified by replacing deterministic duration by a dynamic one. Finally computational experiments for this heuristic approach are provided.
语种英语
引用统计
文献类型会议论文
条目标识符http://ir.sia.cn/handle/173321/19948
专题工业信息学研究室_工业控制系统研究室
通讯作者Lu R(卢睿)
作者单位1.Key Laboratory for Process Industry Automation, Ministry of Education, Northeastern University, Shenyang, 110004, China
2.Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang 110016, China
推荐引用方式
GB/T 7714
Lu R,Li LY. A heuristic approach for rework-based product design project scheduling problem[C]. NEW YORK:IEEE,2008:1486-1491.
条目包含的文件 下载所有文件
文件名称/大小 文献类型 版本类型 开放类型 使用许可
A heuristic approach(262KB)会议论文 开放获取CC BY-NC-SA浏览 下载
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Lu R(卢睿)]的文章
[Li LY(李林瑛)]的文章
百度学术
百度学术中相似的文章
[Lu R(卢睿)]的文章
[Li LY(李林瑛)]的文章
必应学术
必应学术中相似的文章
[Lu R(卢睿)]的文章
[Li LY(李林瑛)]的文章
相关权益政策
暂无数据
收藏/分享
文件名: A heuristic approach for rework-based product design project scheduling problem.pdf
格式: Adobe PDF
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。