Selected(0)Clear
Items/Page: Sort: |
| A study of flexible flow shop scheduling problem with variable processing times based on improved bat algorithm 期刊论文 International Journal of Simulation and Process Modelling, 2020, 卷号: 15, 期号: 3, 页码: 245-254 Authors: Bian, Jianyong; Yang LY(杨丽英)
Adobe PDF(482Kb)  |   Favorite  |  View/Download:71/14  |  Submit date:2020/06/21 flexible flow shop bat algorithm BA variable processing time Hamming distance adaptive position update |
| Implementation of smart manufacturing maturity assessment framework: A socio-technical perspective 会议论文 2020 International Conference on Environment and Water Resources Engineering, EWRE 2020, Nanjing, China, September 11-13, 2020 Authors: Yue L(岳磊); Wang, Zhou; Fang, Yifang; Han ZH(韩忠华)
Adobe PDF(423Kb)  |   Favorite  |  View/Download:25/4  |  Submit date:2020/09/26 |
| 基于Stackelberg博弈的边缘云资源定价机制研究 期刊论文 计算机科学与探索, 2020, 页码: 1-12 Authors: 刘荆欣; 王妍; 韩笑; 夏长清 ; 宋宝燕
Adobe PDF(860Kb)  |   Favorite  |  View/Download:37/1  |  Submit date:2020/10/24 移动边缘计算 资源定价机制 Stackelberg博弈 强化学习 |
| Assign multiple AUVs to form a row efficiently based on a method of processing the cost matrix 期刊论文 Applied Ocean Research, 2020, 卷号: 101, 页码: 1-9 Authors: Zhang J(张进) ; Kang S(康帅); Yu JC(俞建成) ; Liu SJ(刘世杰) ; Li W(李伟) ; Chen, Kylie
Adobe PDF(2009Kb)  |   Favorite  |  View/Download:117/21  |  Submit date:2020/07/04 Multiple AUVs Underwater vehicles Optimal assignment Hungarian method Form a row |
| Resource allocation methodology based on object-oriented discrete event simulation: A production logistics system case study 期刊论文 CIRP Journal of Manufacturing Science and Technology, 2020, 卷号: 31, 页码: 394-405 Authors: Li GZ(李广振); Yang SL(杨圣落); Xu ZG(徐志刚) ; Wang JY(王军义) ; Ren, Zhaohui; Li, Guobing
Adobe PDF(1919Kb)  |   Favorite  |  View/Download:105/11  |  Submit date:2020/08/29 Resource allocation Production logistics system Object-oriented discrete event simulation Decision making Case studylant Simulation software |
| Bottleneck identification and alleviation in a blocked serial production line with discrete event simulation: A case study 期刊论文 ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2020, 卷号: 15, 期号: 2, 页码: 125-136 Authors: Li GZ(李广振); Xu ZG(徐志刚) ; Yang SL(杨圣落); Wang HY(王鸿宇); Bai XL(白鑫林) ; Ren ZH(任朝晖)
Adobe PDF(600Kb)  |   Favorite  |  View/Download:146/21  |  Submit date:2020/09/12 Serial production line Bottleneck identification Bottleneck alleviation Discrete event simulation Plant Simulation Case study |
| The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery 期刊论文 International Journal of Production Research, 2020, 页码: 1-19 Authors: Yang SL(杨圣落); Xu ZG(徐志刚)
Adobe PDF(2235Kb)  |   Favorite  |  View/Download:192/43  |  Submit date:2020/05/24 scheduling distributed assembly flowshop variable neighbourhood descent iterated greedy batch delivery flexible assembly |
| Anomaly Detection of Marine Diesel Engine Valve System based on Mahalanobis Distance 会议论文 2020 Global Reliability and Prognostics and Health Management, PHM-Shanghai 2020, Shanghai, China, October 16-18, 2020 Authors: Sun Y(孙越); Xu AD(徐皑冬) ; Wang K(王锴) ; Jia, Shuli; Guo HF(郭海丰) ; Han XJ(韩晓佳)
Adobe PDF(976Kb)  |   Favorite  |  View/Download:4/0  |  Submit date:2021/02/14 Diesel engine valve system roller fault anomaly detection MD Box-Cox transformation |
| 预测控制稳态目标计算与动态跟踪控制策略研究 学位论文 硕士, 沈阳: 中国科学院沈阳自动化研究所, 2019 Authors: 刘博文
Adobe PDF(1257Kb)  |   Favorite  |  View/Download:75/9  |  Submit date:2019/07/14 预测控制 增量分辨率 LP或QP问题 稳态目标 动态控制 |
| Research on the production scheduling method of a semiconductor packaging test based with the clustering method 期刊论文 International Journal of Information Systems and Supply Chain Management, 2019, 卷号: 12, 期号: 2, 页码: 36-56 Authors: Han ZH(韩忠华); Zhang Q(张权); Jiang, Yongqing; Duan B(段彬)
Adobe PDF(1088Kb)  |   Favorite  |  View/Download:110/18  |  Submit date:2019/07/14 Clustering Method Method of Semiconductor Packaging Test Rule Learn Scheduling |