SIA OpenIR

Browse/Search Results:  1-4 of 4 Help

Selected(0)Clear Items/Page:    Sort:
变工时柔性流水车间排产优化问题研究 期刊论文
计算机仿真, 2018, 卷号: 35, 期号: 7, 页码: 158-164
Authors:  韩忠华;  朱伯秋;  林硕;  宫巍
View  |  Adobe PDF(1202Kb)  |  Favorite  |  View/Download:42/10  |  Submit date:2018/09/30
柔性流水车间  蝙蝠算法  变工时  汉明距离  自适应位置更新  
Research on Flexible Flow Shop Scheduling Problem with Variable Processing Times 会议论文
10th International Conference on Modelling, Identification and Control, ICMIC 2018, Guiyang, China, July 2-4, 2018
Authors:  Gao ZJ(高治军);  Jia, Meiqi;  Han ZH(韩忠华);  Zhu, BQ(朱伯秋)
View  |  Adobe PDF(479Kb)  |  Favorite  |  View/Download:20/5  |  Submit date:2018/12/24
Flexible Flow Shop  Shuffled Frog-Leaping Algorithm  Variable Processing Times  Self-Adaptive Maximum Update Distance  
Bat Algorithm for Flexible Flow Shop Scheduling with Variable Processing Time 会议论文
Advances in Intelligent Systems and Computing, Kunming, China, May 20-21, 2017
Authors:  Han ZH(韩忠华);  Zhu, Boqiu;  Lin, Hao;  Gong, Wei
View  |  Adobe PDF(332Kb)  |  Favorite  |  View/Download:128/19  |  Submit date:2017/12/11
Flexible Flow Shop  Bat Algorithm  Variable Processing Times  Hamming Distance  Adaptive Position Update  
基于改进蝙蝠算法的柔性流水车间排产优化问题研究 期刊论文
计算机应用研究, 2017, 卷号: 34, 期号: 7, 页码: 1935-1938
Authors:  韩忠华;  朱伯秋;  史海波;  林硕
View  |  Adobe PDF(369Kb)  |  Favorite  |  View/Download:189/14  |  Submit date:2016/09/04
柔性流水车间  蝙蝠算法  精英个体集  汉明距离